PRO-POXY 300 Fast Test Data
Test Data: PRO-POXY(TM) 300 FAST
ASTM C-881 | Types I, II*, IV & V* | Grade 3, Classes A, B & C
Download PDF (18 Kb PDF)

 

LABORATORY TESTS

RESULTS

SPECIFICATIONS

C-881  Consistency

pass

¼ inch non-sag

 

C-881  Gel Time

7 Minutes

> 5 Minutes1,4

 

C-882   Bond Strength (2 day cure)

2,200 psi

1,000 psi1,4 

Minimum

C-882   Bond Strength (14 day cure)

4,100 psi

1,500 psi1,2,4,5

Minimum

D-570  Absorption

0.12%

1.0%1,2,4,5

Maximum

D-648  Heat Deflection Temperature

145°F

120°F4,5

Minimum

D-2566  Linear Coefficient of Shrinkage

0.0014

0.0051,2,4,5

Maximum

D-695   Compressive Strength

12,400 psi

8,000 psi1,5

10,000 psi4

Minimum

D-695   Compressive Modulus

316,100 psi

150,000 psi1,5

200,000 psi4

Minimum

D-638 Tensile Strength

8,200 psi

5,000 psi1

7,000 psi4

Minimum

D-638   % Elongation at Break

1.2%

1.0%1,2,4,5

Minimum

 

   1 - ASTM C-881 Type I
   4 - ASTM C-881 Type IV
Epoxy Polymer Extends Life For World's Longest Covered Bridge It’s a smoother and safer ride for motorists crossing over the Hartland Covered Bridge in Hartland, New Brunswick, Canada—the world’s longest covered bridge. The bridge deck has been covered with an epoxy polymer overlay from Unitex.
by Shawn Merrithew Bridge closed again, repairs continue ... She said the polymer should enhance the 107-year-old bridge's lifespan. Developed by Unitex Chemicals, the epoxy polymer overlay is more flexible and more corrosion-resistant than asphalt, says Unitex president John Grissinger...
by Jerry Byrne The spread defense: Crews save significant time and maintenance costs with overlay in Kansas The last time Wildcat Construction Co. repaired the I-135 bridge in Wichita, Kan., more than 20 years ago, it took nearly two years, and lanes were closed or diverted both day and nigh
By Rebekah Rosenfeld Kansas bridge polymer surface project is largest in United States. When it came time to resurface the concrete on a portion of one of I-135’s expressways in Wichita, the Kansas Department of Transportation (KDOT) decided to repair the 1.76 million square feet using epoxy.